Baztab News

Section 3 of Iran-Afghanistan rail corridor makes 80% progress

29 Apr 2018 Wadsam Afghanistan Business News

Officials from Iran have reported that 80% progress has been made in section-3 of Khwaf-Herat railroad, part of Iran-Afghanistan rail corridor.

The 137-km railroad has four sections. Two of the sections (76km long) have already been completed on the Iranian territory.

When completed, the railroad will link Iran’s city of Khwaf to Herat. This will be Afghanistan’s first railroad link to Iran and the country’s only link to the Persian Gulf and the Sea of Oman.

The railroad will have the capacity of transporting 27mn tons of cargo a year. It will be used for transportation of passengers as well.

The post Section 3 of Iran-Afghanistan rail corridor makes 80% progress appeared first on Wadsam.

Original Link: http://wadsam.com/afghan-business-news/section-3-iran-afghanistan-rail-corridor-makes-80-progress-9898/

Open Original News

More from Wadsam Afghanistan Business News

Latest News:

Loading